Pumping Station And Steel Water Pipeline In Lokbatan

Duration:

May, 2014 - April, 2016

Project Description:

Construction of a pumping station and steel water pipeline.

 

Project Location:

Azerbaijan

 

Contract Value:

14.605.000 USD

 

Employer:

“Azersu” Open Joint Stock Company

 

Project Details:
Construction of a pumping station with a capacity of 300,000m3/day
Drilling 60 wells with 30m depths
Installation of 6 units of FLYGT pumps
Construction of steel pipelines:

  • Diameter 1620mm; Length – 2144m
  • Diameter 2020mm; Length – 555m