Pumping Station And Steel Water Pipeline In Lokbatan
Duration:
May, 2014 - April, 2016Project Description:
Construction of a pumping station and steel water pipeline.
Project Location:
Azerbaijan
Contract Value:
14.605.000 USD
Employer:
“Azersu” Open Joint Stock Company
Project Details:
Construction of a pumping station with a capacity of 300,000m3/day
Drilling 60 wells with 30m depths
Installation of 6 units of FLYGT pumps
Construction of steel pipelines:
- Diameter 1620mm; Length – 2144m
- Diameter 2020mm; Length – 555m