Guba Project

Duration:

November, 2011 - September, 2014

Project Description:

Construction of water supply and sewerage network with pumping stations and fully automated filtration and chlorination units

 

Project Location:

Guba, Azerbaijan

 

Contract Value:

141.666.000 USD

 

Name of Employer:

“Azersu” Open Joint Stock Company

 

Project Details:

  • Construction of drinking water pipeline – 296,7 km
  • Construction of sewerage network – 227,2 km
  • Installation of natural filtration on Kudial-chay river and water delivery to a reservoir by a pipeline
  • Installation of natural filtration with a capacity of 780m3/hr
  • Construction of a water reservoir with a capacity of 14000m3
  • Installation of SCADA system
  • Installation of chlorination systems
  • Installation of fully-automated Culligan HF6 UF480 filtration system and construction of a filtration facility
  • Construction of 2 pumping stations
  • Construction of the administrative building for OJSC“AZERSU”