Guba Project
Duration:
November, 2011 - September, 2014Project Description:
Construction of water supply and sewerage network with pumping stations and fully automated filtration and chlorination units
Project Location:
Guba, Azerbaijan
Contract Value:
141.666.000 USD
Name of Employer:
“Azersu” Open Joint Stock Company
Project Details:
- Construction of drinking water pipeline – 296,7 km
- Construction of sewerage network – 227,2 km
- Installation of natural filtration on Kudial-chay river and water delivery to a reservoir by a pipeline
- Installation of natural filtration with a capacity of 780m3/hr
- Construction of a water reservoir with a capacity of 14000m3
- Installation of SCADA system
- Installation of chlorination systems
- Installation of fully-automated Culligan HF6 UF480 filtration system and construction of a filtration facility
- Construction of 2 pumping stations
- Construction of the administrative building for OJSC“AZERSU”