Sewerage Collector And Pumping Station in Sumgait City

Duration:

August, 2011 - November, 2014

Project Description:

Removal of sewerage streams from the city center and connection of 30 different sewerage streams of Sumgait City’s sewerage system at a single pumping station

 

Project Location:

Sumgait, Azerbaijan

 

Contract Value:

57.692.000 USD

 

Employer:

“Azersu” Open Joint Stock Company

 

Project Details: 

Excavation Works – 273000 m3

Construction of a pumping station and mechanical works (TM1) – 55000 m3/day

Construction of discharge pumps (AATM) – 110000 m3/day

Electrical and mechanical works of the pumping station (AATTM)

Routing all the sewage streams flowing freely into the sea from the coastal strip of the city of Sumgait to the pumping station AATTM and wastewater treatment facilities

 

ø 400mm – HDPE – 588 m

ø 450mm – HDPE – 62 m

ø 500mm – HDPE – 1045 m

ø 560mm – HDPE – 588 m

ø 710mm – HDPE – 1045 m

ø 600mm – Corrugated – 348 m

ø 1000mm – Corrugated – 3228 m

ø 1600mm – Corrugated – 7260 m

ø 2000mm – Corrugated – 607 m

ø 1000mm – GRP – 4040 m

ø 600mm – Concrete – 62 m

ø 1000mm – Concrete – 330 m

ø 200mm – Concrete – 666 m