Wastewater Collector Project In Zabrat

Duration:

July, 2011 - April, 2012

Project Description:

Construction of a gravity-flow sewerage pipeline to eliminate the wastewater pumping station system in the settlement of Zabrat/Baku. After the completion of the project, OJSC ”Azersu” will not use a pumping station saving on energy and manpower costs.

 

Project Location:

Azerbaijan

 

Contract Value:

9.745.000 USD

 

Employer:

“Azersu” Open Joint Stock Company

 

Project Details:
Excavation works – 312,000m3
Construction of GRP pipelines:

  • Diameter 1400mm; Length – 2247m

Construction of corrugated pipelines:

  • Diameter 1400mm; Length – 1158m